API RP 2L:1996(R2006) pdf download.Recommended Practice for Planning, Designing, and Constructing Heliports for Fixed Offshore Platforms
4 Planning
4.1 GENERAL
4.1.1 This section serves as a guide for the design and construction of heliports on offshore platforms. Adequate planning should be performed before actual design is started in order to obtain a safe and practical heliport with which to accomplish the design objective. Initial planning should include all criteria pertaining to the design of the heliport. The safety departments of the helicopter companies can provide valuable assistance during the planning phase. 4.1.2 In planning the heliport, consideration should be given to the helicopter’s gross weight, landing load distribu- tion, rotor diameter, overall length, and landing gear config- uration, as well as ground cushion area and the number of helicopters to be accommodated by the heliport. 4.1.3 Design criteria presented herein include operational requirements, safety considerations, and environmental aspects which could affect the design of the heliport.
4.3.3 Size Heliport size should depend on platform configuration and equipment arrangement, platform orientation, obstruc- tion clearances, the selected helicopters to be utilized, and prevailing environmental conditions. The heliport ground cushion area should cover a circle of at least one main rotor diameter for helicopters operating at maximum gross weight. See Figure 2. For tandem rotor helicopters, or in harsh environmental areas (such as the Gulf of Alaska), the dimensions of the ground cushion area should equal or exceed the OL of the limiting helicopter. When ground cushion area is less than one RD (or OL for tandem rotor helicopters or in harsh environments), the approach and departure zone should be extended to 360 degrees, and heli- copters landing or taking off from such a heliport should be restricted to less than the certified maximum takeoff weight. For multi-helicopter heliports, the heliport should be of sufficient size to allow for the OL of the operating helicop- ter plus at least one-third the main RD clearance to any por- tion of a properly parked helicopter with its main rotor secured (see Figure 3). 4.3.4 Orientation Orientation of the heliport should be determined by the platform configuration, equipment arrangement, and pre- vailing wind. 4.3.5 Access and Egress The location of access and egress stairways or ladders should be determined from platform configuration, equip- ment arrangement, and safety objectives. One primary access and egress route should be provided. When possible the access and egress routes should be outside the approach and departure zone.

                                           Related Information                                             Download
PS:Thank you for your support!
API TR 10TR2:1997(R2002) pdf download API Standards

API TR 10TR2:1997(R2002) pdf download

API TR 10TR2:1997(R2002) pdf download.Shrinkage and Expansion in Oilwell Cements 4.1.1 Some equipment measures the external volume change. Other equipment measures the volume of fluid intake or expulsion during the hydration. Measurement of V, and y must...
Read More
API Std 1104:2005 pdf download API Standards

API Std 1104:2005 pdf download

API Std 1104:2005 pdf download.Welding of Pipelines and Related Facilities 1.1 SCOPE This standard covers the gas and arc welding of butt, fillet, and socket welds in carbon and low-alloy steel piping used in the compression, pumping,...
Read More
API STD 613:2003 pdf download API Standards

API STD 613:2003 pdf download

API STD 613:2003 pdf download.Special Purpose Gear Units for Petroleum, Chemical and Gas Industry Services 1.1 SCOPE This standard covers the minimum requirements for spe- cial-purpose, enclosed, precision single- and double-helical one- and two-stage speed increasers and...
Read More

LEAVE A REPLY

Anonymous netizen Fill in information