IEEE 495-2007 pdf download IEEE Guide for Testing Faulted Circuit Indicators
1. Overview
Faulted circuit indicators (FCIs) used by the electric utility industry are applied to overhead andunderground power distribution circuits. This guide describes the general test requirements applied to FCIs.
1.1 Scope
This test code establishes definitions, service conditions, test procedures, and test conditions for FCIs foruse on power distribution systems.
1.2 Purpose
FCls are commonly used by electric utilities to aid in service restoration. The purpose of this guide is toidentify the various tests and test conditions that FCIs must meet to validate their performance.
2. Definitions
For the purposes of this guide, the following terms and definitions apply. The Authoritative Dictionary ofEEE Standards Terms B57′ should be referenced for termms not defined in this clause.
2.1 reset condition: The state of or the act of change of a faulted circuit indicator (FCI) indicating anunfaulted state.
2.2 reset device: A tool for manually resetting a faulted circuit indicator (FCI) from a faulted condition toan unfaulted condition.
3. Service conditions
31 Usual service conditions
The FCI should be suitable for use under one or more of the following intended service conditions when:Exposed to direct sunlight, salt spray, or normal expected pad mount conditionsNot exposed to direct sunlight or salt spray
Buried in earth (sensor only)
Submerged in water intermittently or continuously to a depth of 4.5 m (15 ft)
Exposed to rain, snow,hail
Operating temperature range of-40C to +85C
Applied on systems up to 46 kV phase-to-phase
3.2 Unusual service conditions
Service conditions other than those listed in 3.1 are considered to be unusual. Consult the manufacturer forrecommmendations.
4. Testing
4.1 Design tests
All applicable tests specified in 4.4 should be performed by the manufacturer to demonstrate that FCIs meettheir ratings and are suitable for operation under the intended service conditions.
In addition, the manufacturer should periodically test a sufficient number of production FCIs to ensurecontinuing compliance with design tests.
4.2 Production tests
The production tests of 4.2.1 and 4.2.2 should be performed on every FCI

                                           Related Information                                             Download
PS:Thank you for your support!
IEEE C63.19-2011 pdf download IEEE Standards

IEEE C63.19-2011 pdf download

IEEE C63.19-2011 pdf download American National Standard Methods of Measurement of Compatibility between Wireless Communications Devices and Hearing Aids .3 Organization and use of the standard These technical requirements specify the measurement methods and categorical levels to...
Read More
IEEE 1609-4-2011 pdf download IEEE Standards

IEEE 1609-4-2011 pdf download

IEEE 1609-4-2011 pdf download IEEE Standard for Wireless Access in Vehicular Environments (WAVE)— Multi-channel Operation control channel (CCH) interval: A specified periodic interval of time with respect to CoordinatedUniversal Time (UTC). During the CCH interval a device...
Read More
IEEE 1725-2012 pdf download IEEE Standards

IEEE 1725-2012 pdf download

IEEE 1725-2012 pdf download IEEE Standard for Rechargeable Batteries for Cellular Telephones 3. Definitions For the purposes of this document, the following terms and definitions apply. The IEEE StandardsDictionary: Glossary of Terms & Definitions should be consulted...
Read More

LEAVE A REPLY

Anonymous netizen Fill in information